C&I Solutions

RoadMap to RE100

AMPIN Energy Transition can provide customers the roadmap and end to end solutions to reach RE100. AMPIN is best suited to address all markets and technologies with a unique capability to deliver phase wise deployment to help corporates meet their sustainability targets.
1On-Site / Distributed Generation Solutions

  • Ground Mount Projects
  • Rooftop Projects
  • Solar / Solar + Storage/Storage Projects
  • Primarily OPEX and selective CAPEX

  • Solar Project at customer’s premises- roof/ ground

  • Customer enjoys benefits of solar power on CAPEX/ OPEX basis
2Off-Site / Open Access Solutions

  • 3rd party sale
  • Captive/ Group Captive Projects
  • Solar/Wind/Storage/Hybrid Projects
  • Primarily OPEX and selective CAPEX

  • RE Project bus bar to s/s of Transmission / Distribution Company

  • Transmission, Wheeling & Banking through Utility network

  • DISCOM to Customer as per existing arrangement

Value Proposition

  • Lower power cost.
  • Minimal to no investment.
  • Meet their sustainability targets.
  • Long term predictable pricing.
  • Efficient use of unused/ vacant space on roofs.
  • Hassle-free maintenance ensures high performance of the plant.

Why Us?

  • Programmatic Approach that reduces transaction cost on a pan India basis.
  • Handholding to achieve 100% RE as AMPIN has the required utility expertise to offer Inter-State (ISTS) and VPPA solutions.
  • One Stop Shop for Energy across different geographies and technologies such as Solar, Wind, Hybrids, Storage.
  • Successful case studies for different project types that demonstrates AMPIN’s capability of delivering such projects.

Case Studies

  • Auto/Auto Ancillary

    Case Study: Skoda Auto Volkswagen India Pvt Ltd – 18.5MWp (Phase 1- 8.5 MWp + Phase 2- 10MWp) (Rooftop), Pune, Maharashtra

    This is India’s largest solar-powered rooftop plant in the automotive industry.

    • AMPIN Energy Transition has successfully commissioned an 18.5MWp rooftop solar plant for Skoda Auto Volkswagen India in Pune, Maharashtra. This project was executed in two phases with Phase 1 of 8.5 MWp and Phase 2 of 10 MWp.
    • The rooftop solar plant is installed at Skoda Auto Volkswagen India’s manufacturing unit in MIDC Chakan, Pune, Maharashtra.
    • The rooftop solar plant will replace up to 45% of the electricity requirements for Skoda Auto Volkswagen India Pvt Ltd’s manufacturing unit, reducing electricity costs by approximately 58% compared to the grid tariff.
    • The electricity generated during the plant life cycle of 25 years would be approximately ~308,000 MWh which will save ~2,20,000 Ton of CO2 from the environment.
  • Pharma, Hospitals, & Healthcare

    Case Study: Cipla Ltd.- 35 (30+5) MW (Open Access), Tuljapur, Maharashtra

    This plant is the Largest Solar Open Access Project in Maharashtra.

    • AMPIN Energy Transition has partnered with Cipla to set up the Largest Solar Open Access Project in Maharashtra. This project is spread across 115 acres of land and is supplying power to Cipla’s 6 manufacturing units located in Patalganga and Kurkumbh).
    • As part of Cipla’s sustainability initiative, this plant will help the company avoid carbon dioxide emissions by as much as 35,000 tonnes equivalent (tCO2e) annually over its project life of 25 years.
  • Heavy Industries, Cement & Steel

    Case Study: MP Birla Corporation.- 28MWp (Open Access), Payagpur, Uttar Pradesh

    This plant is the first captive solar open access project.

    • AMPIN Energy Transition has set up a captive solar open access project in Uttar Pradesh. This project is spread across 98.11 acres of land in Payagpur, Uttar Pradesh.
    • The power supplied from this solar plant is used by MP Birla Corporation for meeting their energy requirements at 2 of their manufacturing facilities located in Kundanganj, Rae Bareilly.
    • The plant generates about 4,43,15,000 units annually and replaces almost 75% and 50% of power requirements at the 2 facilities of MP Birla Corporation.
  • Data Centres & Information Technology

    Case Study: Bharti Airtel Ltd.- 28MWp (Open Access), Tilhar, Uttar Pradesh

    This plant is the first captive solar open access project.

    • AMPIN Energy Transition has set up a captive solar open access project in Uttar Pradesh. As part of Airtel’s green initiative and sustainable development, this plant supplies solar power to meet the energy requirements for its data center facility (Nxtra Data) in the state.
    • With datacentres playing a key role to India’s digital economy and this solar project (supplying power to Airtel’s data centres) supports the Government’s Digital India mission of transforming India into a digitally empowered society and knowledge economy.
  • Infra & Real Estate

    Case Study: L&T Metro Rail Hyderabad Ltd.- 7.805MWp (Open Access), Hyderabad, Telangana

    This plant is one of the largest behind the meter projects in India and particularly challenging because it involved working on operational metro stations at night time and only for a few hours.

    • AMPIN energy has installed 7.805 MW solar plant supplying power to L&T in Hyderabad, Telangana for the metro project to supply solar power to its 24 stations and 2 depots in the city.
    • The solar plant generates approx 11,300 MWh of green energy in a year (equivalent to reducing approx. 8,000 MT of carbon emissions annually)and meets 15% of the total electrical consumption of the Hyderabad Metro Rail Project.
    • This project is a perfect example of a high-quality reliable RE system powering an eco-friendly and sustainable transportation system. We believe that projects like these will provide the right momentum for a mass public transport across cities in India to switch to sustainable energy sources and help meet India’s climate goals.
  • FMCG/ Dairy

    Case Study: Ab InBev- 2.6MW (Open Access), Karnataka

    AMPIN Energy Transition is the main supplier of Renewable Energy to the World’s Largest Brewer- Ab InBev

    • AMPIN Energy Transition supplies solar power to Ab InBev via Open Access in Karnataka. This solar power has 75% of energy supply for AB InBev at their Karnataka facility. This green power has helped Ab InBev to make the clean energy transition, promote sustainability and meet their SDGs (Sustainability Development Goals).
    • Corporate businesses consume almost 50% of the India’s energy generation and have a potential of about 25 – 50 GW of RE adoption by 2023. AMPIN Energy Transition is helping Corporates like Ab InBev switch to renewable energy by buying RE power directly and meeting their sustainability targets. This will make India the largest corporate PPA market in the world and accelerate the shift towards RE.
  • Educational Institutions

    Case Study: 1.2 MW (Rooftop), Multiple Sites, Madhya Pradesh

    This project is one of its kind where solar is installed on government institutions and was implemented under the Central Government’s Rooftop Solar Programme with support from the World Bank under the Global Environment Facility Fund.

    • AMPIN Energy has installed 1.2 MW (out of total 2.25 MW) rooftop across Educational Institutions in Madhya Pradesh. AMPIN won this bid under Madhya Pradesh Urja Vikas Nigam Ltd’s First ever Solar Rooftop Tender under RESCO mode.
    • The 1.2 MW capacity is installed across 5 sites in Madhya Pradesh such as Bhopal, Jabalpur and Gwalior and supplies power to educational institutions such as National Law University, School of Planning & Architecture, CIPET, Atal Bihari Vajpayee Indian Institute of Information Technology and Management and Pandit Dwarka Prasad Mishra Indian Institute of Information Technology, Design and Manufacturing.
    • The solar power from these rooftop plants helps meet the energy requirements of these educational institutions and helps them to make positive impact on the environment.

Contact

011-43888900

Copyright © 2024 AMPIN Energy Transition

Search